WEEK 18 Activity FYP1

Image
 Proposal Submission We have been informed the final date of submissions for proposal report and logbook which is 18 Nov 2020. For FYP1 student need to submit the soft copy to our supervisor to check the plagiarism that the overall percentage cannot exceed 20 percent.

WEEK 17 Activity FYP1

Image
  Proposal Report Chapter 3 Start to complete chapter 3 which is Methodology Draft:- CHAPTER 3: METHODOLOGY 3.1 Introduction  explain a little bit of problem statement, aim, and then proceed to method to used to implement this project. 3.2 Block Diagram  as mention in previous activities 3.3 Schematic Diagram  Running simulation using software etc. proteus 3.4 List of Hardware and Software  briefly explain all the component function in details. - Vibration Sensor Module  - Ultrasonic Sensor  - IR Sensor  - Liquid Crystal Display (LCD)  - Arduino Uno  - GPS Module  - GSM Module  - Arduino IDE  3.5 Flowchart  put in the flowchart that has been done before. And then, briefly explain them one by one 3.6 Work Planning  -Work Breakdown Structure -Gantt Chart 3.7 Production Cost 3.8 Summary -summarized all sub chapter on methodology.

WEEK 16 Activity FYP1

Image
 Proposal Report Chapter 2 Start to complete chapter 2 which is Literature Review for previous project literature review Draft:-